Fracturing

The mission of "TRUST ENGINEERING" is to meet and exceed customer expectations by offering modern quality equipment, and to establish long-term partnerships.


Semitrailer mounted Frac Sand Truck
Semitrailer mounted frac sand truck is designed for transportation, temporary storage and supply of proppant into a mixer (blender) hopper during fracturing operations on the well.
 
Chassis mounted Frac Sand Truck
Frac sand truck is designed for transportation, temporary storage and supply of proppant  into a hopper mixer (blender) during fracturing operations on the well.
 
Tank-Semitrailer for Process Liquid
Tank semi-trailer is designed for the preparation, storage and dispensing of process liquids during hydraulic fracturing of oil and gas wells. It can be used both individually and in the tank complex.
 
Proppant Storage Vertical Tank
The tank is designed for vertical storage and delivery of proppant.
 
Vertical Tank
Fracturing
The tank  is designed for preparation and dispensing process liquids (hydrochloric acid with concentration to 24%, water, gels, and mixtures) during hydraulic fracturing and well acidizing.
 
Hot Water Unit
Fracturing
The unit is designed for heating process liquids used for gels preparation during hydraulic fracturing. It may be used as part of  equipment complex for fracturing and independently.
 
Manifold Unit
Fracturing
It is designed to connect the blender to the pump units and to connect the pump units to the wellhead during hydraulic fracturing, hydro-sand-blast perforation and other technological operations on the oil and gas wells.
 
Special Vehicle for Transportation of Heavy Process Equipment
The unit is designed for transportation of heavy process equipment on and off road. Handling operations are performed without additional lifting devices. The unit is most often used for transportation of the manifold units.
 
Unit for Transportation and Dispensing Chemicals
The unit is designed for transportation of chemical reagents to the work site and dosing them during the process of hydraulic fracturing, as well as for independent (without mixing unit) process execution of large-matrix acidizing, acid fracturing or prior preparation of the fracturing fluid before arrival of frac fleet.
 
Unit  for Transportation and Dispensing Chemicals 6
The unit is designed for transportation of chemical reagents to the work site and  dosing them during the process of hydraulic fracturing.
 
Control and Monitoring Mobile Station
It is designed for management and control, as well as for setting the operating parameters, data collection and analysis during hydraulic fracturing process.
 
Hydration Unit
Fracturing
The unit is designed for the preparation of gel (guar aqueous solution) for hydraulic fracturing operations on the workplace.
 
Mixing (Blender) Unit for Hydraulic Fracturing
The unit is designed to prepare process liquids during sandblast perforation and hydraulic fracturing.
 
Pump Unit for Hydraulic Fracturing
The unit is designed for pumping the inhibited acid solutions, for sandblast perforation and hydraulic fracturing during technical operations of the intensification of oil and gas wells and other washing and squeezing jobs during the operation of the well and its repair.