Cementing

The mission of "TRUST ENGINEERING" is to meet and exceed customer expectations by offering modern quality equipment, and to establish long-term partnerships.


The Plunger Pump
Plunger pump is designed to inject the working liquid during hydraulic fracturing of oil and gas-bearing formations, cementing, hydro-sand-blast perforation, washing out sand plugs, well killing and other washing and squeezing jobs during the development and operation of wells.
 
Mixing Unit
Cementing
The unit  is designed for batch preparation of all types of solutions used during cementing, repair and insulation works and acidizing wells. The unit can be used for continuous preparation of mortar.
While mortar preparation, one tank can be used for modification of proportions and injection of additives as well as making the solution more homogeneous.
 
Mixing Unit  8
Cementing
The unit is designed for automatic continuous dosing and preparation of the mortar  during construction and repair of oil and gas wells.
 
Frame Mounted Pump Unit with 5-Plunger Pump
Unit is designed for pumping inhibited acid solutions, sandblast perforation and  hydraulic fracturing during technical operations of the intensification of oil and gas wells and other washing and squeezing jobs during the operation of the well and its repair.
 
Pump Unit for Well Cementing and Hydraulic Fracturing
The unit is designed for supplying process  liquids under pressure by plunger pumps during cementing, hydro-sand-blast perforation, bottom zone acidizing, oil and gas wells killing, washing out sand plugs and other washing and squeezing jobs, carried out on oil and gas fields.
 
Double-Pump Cementing Unit
The unit is designed for supplying process  liquids under pressure by plunger pumps during cementing, hydro-sand-blast perforation, bottom zone acidizing, oil and gas wells killing, washing out sand plugs and other washing and squeezing jobs, carried out on oil and gas fields.
 
Single-Pump Unit
The unit is designed for supplying process  liquids under pressure by plunger pumps during cementing, hydro-sand-blast perforation, bottom zone acidizing, oil and gas wells killing, washing out sand plugs and other washing and squeezing jobs, carried out on oil and gas fields.
 
Cementing Complex for Oil and Gas Wells
The unit is designed for supplying process  liquids under pressure by plunger pumps during cementing, hydro-sand-blast perforation, bottom zone acidizing, oil and gas wells killing, washing out sand plugs and other washing and squeezing jobs, carried out on oil and gas fields.