Cementing Complex for Oil and Gas Wells

The mission of "TRUST ENGINEERING" is to meet and exceed customer expectations by offering modern quality equipment, and to establish long-term partnerships.



The unit is designed for supplying process  liquids under pressure by plunger pumps during cementing, hydro-sand-blast perforation, bottom zone acidizing, oil and gas wells killing, washing out sand plugs and other washing and squeezing jobs, carried out on oil and gas fields.

Maximum triplex plunger pump pressure, MPa

75

Triplex plunger pumps total output, m³/min

3.2

Solution density range, g/cm³

From 1.0 to 2.5

Maximum capacity of cement mixing system, m³/min

2.3

Water supply pump maximum flow, L/s

36

Water supply pump maximum pressure, MPa

0.9

Recirculation pump maximum flow, L/s

50

Rec

0.35

Supercharger pump maximum flow, L/s

40

Supercharger pump maximum pressure, MPa

0.15

Mixing tank volume, m3

1.1

Averaging

1.5

Measurement

4 (2x2)

Operating temperature range, ºС

From -4- to +40

Length, mm

11700

Width, mm

2540

Height, mm

3980

Weight, kg

38300


Components:

  1. Chassis with wheel arrangement 8х8
  2. Two drive diesel engines
  3. Two automatic gearboxes
  4. Two driveshafts
  5. Two triplex plunger pumps
  6. Mixing tank
  7. Measuring tank
  8. Averaging tank
  9. Water supply pump 
  10. Circulation pump
  11. Supercharger pump
  12. Hydraulic system
  13. Suction and discharge manifolds
  14. Elements of autonomus heating of equipment
  15. Tent
  16. Control and measurement devices
  17. Working platform with control panel

Order product
Make a request online, we will contact you in the near future and will answer all your questions.